Crane boilers manual5/3/2023 ![]() The labour force had increased to nearly 2000 people. By 1946 normal production resumed and the Ipswich works was expanded yet again to include a steel valve building and a bronze foundry. ![]() ![]() The only halt in production occurred when the works was bombed in 1941, fortunately little damaged was caused and the site was back up a running after a week.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |